• Call Us: +91-22-25553297

Equipment Performance Studies

Electrical Motors Efficiency

The studies involve measuring electrical parameters for the motor at no load and normal load operation as well as stator resistance motor speed to assess operating efficiency of the individual equipment.

The typical scope of the work covers:

  • Computing / Measuring the fluid flow rate of the waste stream at the inlet of the recovery system
  • Gauging the temperature drop across the recovery system for the waste stream

  • A team of two engineers is deputed to carry out the studies and furnishing the report. The field visit is typically for 5 to 6 hours; during which up to 10 measurements can be carried out depending upon initial preparations,conditions of ducting systems and support from the plant team.