Steam Trap Performance Assessment
The studies involve capturing thermal image of the traps and / or detecting performance with ultrasonic steam trap tester to assess functioning of the individual trap.
The typical scope of the work covers
A team of one engineer is deputed to carry out the studies and furnishing the report. The field visit is typically for 5 to 6 hours; during which up to 4 measurements can be carried out depending upon initial preparations, conditions of motors and cabling systems and support from the plant team.
Although not a part of regular assignment, the following parameters can also be also measured / assessed, if possible and requested by the plant